Track Master railway equipment
2,500,000 - 3,000,000 Per Piece
This is an indispensable part of new rail line construction. This equipment has been design to lift the track ,slewing /lowering/ lifting/ threading of the rail lines that were not possible using manual labour
Country of Origin : India
Type : Railway Track Maintenance Equipment
Certification : CE Certified
...moreSlerper laying machine
Sleeper laying machine is used for contruction of raiway track. This machine is an indispensable part of new track construction easy in the job of laying sleepers which way previously done using labour for this machine simultaneously grips 20 slippers and carries them to the site the hydraulic gripper being grips 20 sleepers that were already placed on a platform that can hold 40 sleepers after giving them hydraulically it it lives them and then the machine runs on the auxiliary track and on reaching the site of laying the sleepers are placed 600 mm Centre to centre