RCC Hume Pipes Dealers in Motiganj, Baleshwar (2 products available)

  • Rcc Hume Pipes

    Rcc Hume Pipes

    Get Price Quote

    we Manufacture and Supply High Quality rcc Hume Pipes. Which are Used in a Variety of Industries. We Offer Rcc Hume Pipes in a Wide Range of Specifications and Sizes to Suit the Requirements of the Clients. Our Rcc Hume Pipes are Sturdy Which Offer Excellent Performance. These Rcc Hume Pipes are Reliable and have a Long Life. Our Rcc Hume Pipes are Manufactured as per Industry Standards and We Supply Our Rcc Hume Pipes to Clients as per Deadlines. attributes high Qualitymeets Industry Standardsavailable as Class Np2, Np3 & Np4 from 300 Mm Dia to 2000mm Diaexcellent Designs applications road Crossing Bridges & Pipe Linesrailway Bridgeslaying Telecommunication, Underground Power Cableswater Mainsstorm Water Drainageirrigation Purposesculverts /sewers & other Construction manufacturing Process mixture : According to Mix Design and Regular Checking Aggregates, Water and Cement are Used By Weight. Instructions are Written On Boards for Proper Mixtures. Instructions are Given to Consume Mixture Within 30 Minutes for Its Proper Strength. is 456 is Followed for This.molding : all Moulds are Properly Cleaned from Hand Grinder After Opening. Proper Supports are Given for Centering of Cages. {if It is Higher Dia 2 Cages are Made as per Is: 458 and Upper Cage is Always 75% of Inner Cage} Proper Oiling is Done On Moulds as Well as On Bushes and Rings. These are Properly Packed with Tie Rods and Nut-bolts.manufacturing : After Molding Moulds are Properly Kept On Runners with the Help of Chain Pulleys. Initially While Pouring the Mixture Rpm of Machine is Very Slow for Proper Pouring and Than Rpm are Up to 1500 as per the Requirement of Is: 458. When the Proper Spinning is Done It Leaves Extra Water Which Gives the Strength to the Pipe. After It, Finishing of Pipes is Done By Cutting from Rods and Brushes.demolding : While Demolding, with the Help of Chain Pulleys Moulds are Separated. Moulds are Demoulded After 24 Hours for Proper Quality of Pipes.curing : After Demoulding with the Help of Trolleys, Hydra and Ceilings Pipes are Kept in Curing Tanks for Proper Curing. Rotation of Pipes is Done Daily. After 28 Days Curing Pipes are Taken Out from Tanks and Storage is Done. specifications dia. Mmld. Mmlength Meternp2np3np4wall Thicknessweight Kg (per Pipe)wall Thicknessweight Kg (per Pipe)wall Thicknessweight Kg (per Pipe)10010022538253825381501502255825582558200200225743091309122522522584301013010125025023094301133011330030023213740180401803503502.53221175494754944004002.53524275566755664504502.53529875636756365005002.53533675706757066005902.54550985960859607006802.5506608511218511218007902.5507549514333514339008902.5559341001697100169710009902.560113011521671152167110010902.565134611523831152383120011902.570158412027121202712140014002.575197813535621353562160016002.580240014042191404219180018002.590360015050881505088200020002.5100376817064061706406220022002.5110456018576681857668240024002.5nana20090432009043260026002.5nana2151053221510532

    more..
  • Rcc Hume Pipes

    Get Price Quote

    Rcc Hume Pipes, PSC Poles, prestressed concrete poles

    more..
  • Best Deals from RCC Hume Pipes

Filter by Locality
top