Earth Auger Dealers in Basai Road, Gurugram

(1 products available)
  • Heavy Duty Pole Erection Machine

    Heavy Duty Pole Erection Machine

    Get Price Quote

    1 Piece(s) (MOQ)

    • Brand Name: PJE

    We are the distinguished Manufacturer, Exporter and Supplier of Pole Erection Machine. The Pole Erection Machine is used to plant big plants and to erect electricity and solar poles. The Pole Erection Machine is a tractor operated application, designed especially for Rural Electrification work hence Pit designs and dimensions can be customized as per pit design. We provide ultra-low initial investment, under the reach of small contractors also. The Pole Erection Machine is used for transformer shifting on pole and VCB installation in substation work as well as other material handling like wire drum loading, unloading etc. We have full back ups of parts inventory which will ensure the smooth operation of machine and lowest breakdown time. Benefits of Pole Erection Machine Huge cost saving , very high speed of work and reduce the burden of labor management Pole Erection Machine eliminates the prevailing labor problem completely thus leads to project on time execution. Nil repairs and maintenance is needed Production capacity of Pole Erection Machine is very high, with proper planning and execution per shift of 8 working hour it can complete the pole installation of 25 to 30 poles per shift by two labors only. The complete cycle of Pole Erection Machine can be done by two labors only against the current manual practice of 12 to 14 labors. Pole Erection Machine takes very little time to make a pit (Approx. 05 to 07 Min) against the time taken by manual labor is 5 to 6 hour. For Rest of the work like Stay, Earthing Pit making will be very high almost 05 to 07 min per pit. Huge cost saving for contractor Avg. a contractor pays 600-800Rs per Pole. Pole can be erected only at the expenses 100 Rs which leads to the saving of Rs 12000- (Twelve thousand per day per machine) in addition to that it also ensures timely execution of the project.

    more..
Filter by Locality
top