Industrial Sheds
250 - 350 Per SQFT
5000 SQFT (MOQ)
Pre Engineered Building Shed
1,000 - 2,000 Per Square Feet
5000 Square Feet (MOQ)
a pre-engineered building is a system utilizing three distinct product categories: built-up “i” to shape primary structural framing members (columns and rafters) cold-formed “z” and “c” to shape secondary structural members (roof purlins, wall girts, and eave struts)
Best Deals from Prefabricated Shed
Industrial Shed
Get Price Quote
We are among the celebrated names in the industry for manufacturing and trading industrial sheds . The offered sheds are made from high grade of sheets and metal, which make them impeccable in strength. Ideal to be used as warehouses, offices, and factories, these sheds are resistant to corrosion, leaks and fire.
aircraft hangar
300 Per Square Feet
aircraft hangar
Get Price Quote
The most common causes of fire in computer control rooms around the world is electricity. Air traffic control room, server room, flight simulators and the data centers are basically computer control rooms. These rooms consist of computer equipments and a maze of power and signal wiring and cables. In spite of the best design there are chances of failure of electrical components which may lead to an electrical fault. The electrical faults may generate enough heat to ignite the combustible material present in the equipment wiring and thereby result in fire. It is most important to detect these fires at incipient stage and suppress to prevent a major loss.
Prefabricated Shelters
Get Price Quote
Prefabricated Shelters, Swiss Cottage Tents, Prefabricated Metal House
Swimming Pool Tensile Cover
Get Price Quote
Swimming Pool Tensile Cover, Car Parking Tensile Structure, tensile fabric
Car Parking Tensile Structure
Get Price Quote
Car Parking Tensile Structure, Modular Tensile Structure, Tensile Umbrella
Prefabricated Factory Shed
Get Price Quote
Prefabricated Factory Shed, Industrial Sheds, Prefabricated Structures