Metal Cutting Tools
Hot Dip Galvanizing Plant
Hot dip galvanizing plant, The manufacturing process in nutshell can be described as under:The steel articles are dipped into "Caustic Soda Solution" for "Degreasing"The load is again rinsed in "Rinsing Tank" containing clean water. Next step is "Pre-fluxing" wherein the material is dipped in "Pre-Fluxing" tank containing "Zinc Ammonium".
...morehot dip galvanising plant
The manufacturing process in nutshell can be described as under: The structural steel grating for galvanizing are procured. The steel articles are dipped into "Caustic Soda Solution" for "Degreasing" The load is rinsed in "Rinsing Tank" containing clean water The load is then preserved in "Pickling Tank" containing HCL 10-12% for first pickling Second pickling is performed in "Second Pickling Tank" which contains HCL - 10-32% The load is again rinsed in "Rinsing Tank" containing clean water Next step is "Pre-fluxing" wherein the material is dipped in "Pre-Fluxing" tank containing "Zinc Ammonium" The load is then dipped into molten zinc at 440-460 degree Celsius which is termed as "Hot Dip Galvanizing" The material then is "Quenched" by passing through running water The material is due for dispatch after "Passivation" and inspection formalities
...moreGalvanizing Plant
The manufacturing process in nutshell can be described as under: The structural steel grating for galvanizing are procured. The steel articles are dipped into "Caustic Soda Solution" for "Degreasing" The load is rinsed in "Rinsing Tank" containing clean water The load is then preserved in "Pickling Tank" containing HCL 10-12% for first pickling Second pickling is performed in "Second Pickling Tank" which contains HCL - 10-32% The load is again rinsed in "Rinsing Tank" containing clean water Next step is "Pre-fluxing" wherein the material is dipped in "Pre-Fluxing" tank containing "Zinc Ammonium" The load is then dipped into molten zinc at 440-460 degree Celsius which is termed as "Hot Dip Galvanizing" The material then is "Quenched" by passing through running water The material is due for dispatch after "Passivation" and inspection formalities.
...moregrindwell norton
Siemens
Be first to Rate
Rate This