RCC Material Dealers in Murbad, Thane

(7 products available)
  • Ground Enhancement Materials

    Ground Enhancement Materials

    Get Price Quote

    LATH Back Fill Compound is a superior conductive material that improves earthing effectiveness, especially in areas of poor conductivity (rocky ground, areas of moisture variation, sandy soils etc.). Tested at NABL Accredited Laboratory, with 0.02 Ohms-meter resistivity it improves conductivity of the earth electrode and ground contact area. high conductivity. Improves earths absorbing power and humidity retention capability. Non-corrosive in nature having low water solubility but highly hygroscopic. Suitable for installation in dry form or in a slurry form. Does not depend on presence of water to maintain its conductivity. Permanent & maintenance free and in its set form, maintains constant earth resistance with time. – thermally stable between -100 C to +600 C ambient temperatures. Does not require periodic charging treatment nor replacement and maintenance. Suitable for any kind of electrode and all kinds of soils of different resistivity. Does not pollute the soil or local water table and meets environment friendly requirements for landfill. Non explosive and does not cause burns, irritation to eye, skin etc.

    more..
  • RMC Concrete Admixture

    RMC Concrete Admixture

    45 Per Piece

    100 Piece (MOQ)

    • Form: Liquid
    • Application: Industrial Use
    • Type: Concrete Admixtures
    • Country of Origin: India
    • Packaging Type: Drum
    • Material: Polymer
    • Grade Standard: Industrial Grade
    • Density: 1350-1500 Kg/m3
    more..
  • Best Deals from RCC Material

  • Oil Free Compressor Aggregates

    Oil Free Compressor Aggregates

    Get Price Quote

    • Flow rate at 0 bar: 25 - 300 lpm (0.88 - 10.6 cfm)
    • Nominal pressure: 7 bar; 10 bar
    • Safety pressure: Upto 11 bar
    • Frequency: 50 / 60 Hz
    • Power: 0.18 - 3 kW (0.24 - 4 hp)
    • Direct coupled: √
    • Oil free: √
    • Expected lifetime: 8000 hours @ 8 bar; 15000 hours @ 5 bar
    more..
  • rcc

    Get Price Quote

    rcc

    more..
  • Building Material

    Get Price Quote

    Building Material

    more..
  • rcc wall

    Get Price Quote

    rcc wall, Manhole Cover, RCC Jali, rcc pipe, Rcc Road Divider

    more..
  • Rcc Pipes

    Get Price Quote

    Rcc Pipes

    more..
Filter by Locality
top